Fixing of WoodenDoor Frames at Our Site

avatar
(Edited)

This morning the upholstery man brought the wooden door frames we requested to our site, so since we are not yet ready to do the plastering work of the house due to fund issue, we decided to fix the door frames at each door according to their various sizes.

IMG-20221018-WA0082.jpg

IMG-20221018-WA0090.jpg

IMG-20221018-WA0085.jpg

The sizes of the door frames varies, for the bedroom and kitchen frames it is 3ft for breadth and 7ft for height, while the door frames of the four toilets and kitchen store is 2.6ft for breadth and 7ft for height.

IMG-20221018-WA0109.jpg

IMG-20221018-WA0110.jpg

IMG-20221018-WA0063.jpg

IMG-20221018-WA0107.jpg

IMG-20221018-WA0107.jpg

IMG-20221018-WA0103.jpg

IMG-20221018-WA0078.jpg

We started off by knocking nails isto the edges of the frames, this is to make it fixated well into place and not be shaky, then we start placing and fixing each door frames to their rightful place, some frames wouldn't fit the door it was meant for, so we had to break off some of the blocks around the door to make room for the frames to fit in, while some frames were way too small for the places it is meant for, so we had to use bricks to cover the gaps/vacuums available.

We make use of the following tools
Shovel
Hammar
Chisel
Measuring Tape
Nails (4-inches nails)
Hand-trowel
Shocking-Wood

IMG-20221018-WA0105.jpg

IMG-20221018-WA0102.jpg

IMG-20221018-WA0093.jpg

IMG-20221018-WA0092.jpg

IMG-20221018-WA0089.jpg

IMG-20221018-WA0086.jpg

IMG-20221018-WA0085.jpg

IMG-20221018-WA0083.jpg

IMG-20221018-WA0082.jpg

IMG-20221018-WA0081.jpg

IMG-20221018-WA0072.jpg

IMG-20221018-WA0068.jpg

IMG-20221018-WA0066.jpg

IMG-20221018-WA0064.jpg

IMG-20221018-WA0082.jpg

We brought along two bags of Cement to the site, one of my sibling went off to mix it with shocking sand outside the building, while another went to get water at a nearby well.
We were served the cement mixture which we filled into the frame edges to make sure it fits well into the walls, atimes supporting it with pieces of bricks where the need call for it.

After rounding up with fixing the door frames, we did some light weeding around our site, that was how our weekend went. How did you spend your weekend too. Mind sharing with me in the comment section.
Do have a funfilled weekend, love you.

all pictures were snapped by me



0
0
0.000
4 comments
avatar

Congratulations @seunny! You have completed the following achievement on the Hive blockchain and have been rewarded with new badge(s):

You got more than 400 replies.
Your next target is to reach 500 replies.
You received more than 2750 upvotes.
Your next target is to reach 3000 upvotes.

You can view your badges on your board and compare yourself to others in the Ranking
If you no longer want to receive notifications, reply to this comment with the word STOP

Support the HiveBuzz project. Vote for our proposal!
0
0
0.000
avatar

Am glad to hear that,
That's a motivating achievement, I look forward meeting new target. Thanks for keeping me updated, do have a funfilled weekend @hivebuzz

0
0
0.000
avatar

This post has been manually curated by @bhattg from Indiaunited community. Join us on our Discord Server.

Do you know that you can earn a passive income by delegating to @indiaunited. We share 100 % of the curation rewards with the delegators.

Here are some handy links for delegations: 100HP, 250HP, 500HP, 1000HP.

Read our latest announcement post to get more information.

image.png

Please contribute to the community by upvoting this comment and posts made by @indiaunited.

0
0
0.000